Multi-level decking over sloping garden, Bristol.

Levelling the site - sloping in 2 directions!

Setting in the posts and laying in the joists and framing.

Starting to lay the decking boards.

The
junction of the 2 different step angles.

The
'entertaining area' and first step.

The
side steps and steeper steps meet towards the back of the
garden.
3538
holes drilled and 297 joist screws.

2841
decking screws and 400 bolts.

Enough
wood left over to construct a couple of extra seating areas.


The
finished garden!